Using the attached spreadsheet (excel file) for a link budget, analyze the downl
Using the attached spreadsheet (excel file) for a link budget, analyze the downlink part of it and propose changes that will lead to closing the link with a margin of 10dB or more for the 4800 bps data rate. The changes should be more logical to implement – for example, do not change orbit altitude. […]